Metal SS304 Air Membrane Double Diaphragm Pump for Kerosine

Metal SS304 Air Membrane Double Diaphragm Pump for Kerosine

 Metal SS304 Air Membrane Double Diaphragm Pump For Kerosine (Kerosene) 

Introduction
QBK series pump is an air operated double diaphragm pump, which is driven by air. It is a sort of optimistic displacement pumps which volume alterations brought on by compressing diaphragms in equally side. This pump not only can exhaust the movement liquid, but also can express some uneasy flowed medium, with the merits of self priming pump, slurry pump and impurity pump, and so forth.

Specification

Model  QBK-fifteen
Inlet/outlet Dia. mm fifteen
inch 1/two
Max. Flow  m3/h 3.42
L/min 57
Head m -eighty four
Max.Suction stroke m seven.6
Max. Particle Dia. mm 2.5
Max. Air CZPT Pressure kg/cm2 8.4

Features
1. The air diaphragm pump has the operate of self priming without having rotating components. It can obtain dry priming and wet priming, which self -priming top is 5m and 8m respectively.
2. With sectional variety construction, this self -priming pump can be used for conveying two different liquid by double diaphragm.

3. Our pump can be utilised straight as a submersible pump, it employs air as the electrical power source, and does not have the leakage and other safety risks. This diaphragm pump has reduced cost than submersible pump which is brought on by the routine maintenance of motor.

4. Pumps offer stall-cost-free, ice-free procedure.
5. Bolt joint design and style supplies even sealing strain for ideal functionality.
6. Diaphragm,ball and ball seat adopt imported materials with lengthier provider life.
seven. Thanks to their pneumatic motor, they could be used in possibly explosive areas.
eight. Can pump corrosive , volatile, flammable, toxic fluids with particles and higher viscosity.

Deal Photograph

Our Support
one. Delivery: Delivery time will be on time as the contract. Usually, the shipping and delivery time of diaphragm pump is 5-7 doing work days.
2. Warranty: one year for the pump physique, 3months for the principal working areas.
three. Package: In accordance to your amount, we use powerful carton or plywood scenario which is sturdy for ocean transport.
four. CZPT: By Sea, By Air and By CZPT Express.
5. Payment: we can settle for T/T, L/C , West CZPT and so on.
six. Pre-income Provider: In accordance to your need, we will give you our profession tips of pump remedy.
7. On-sales Provider: We will obviously demonstrate you every thing in fact when you area an buy with us. We will takes pictures or video clips to display you our creation scenario.
8. After-revenue Provider: We will total report you the manufacturing progress and strategy. In the meantime, we will adhere to up the pump working problems per three months when the pumps put into use, and can deliver the spare areas to you inside one week if u require.

Our Organization

Metal SS304 Air Membrane Double Diaphragm Pump for Kerosine